To help control the PM-10 pollution of Owen’s Valley, my partner Benjamin and I provided a plan that will help control the dust through the work of a grasshopper script and wind machine drawing productions. Four dust control mitigations measure were used throughout our sections of Owen’s Valley. Tillage and gravel were used on the other barrier of the plan while vegetation and water created shelter for potential habitat. The forms of the plan were based off our wind machine drawings which created circle like notions throughout the paper. From the shapes that were formed, we then played with topography that created variety and wind barriers of the site.